Vaspextend control (to be developed)¶
Test VaspExtend control (to be developed)¶
Used to access VaspExtend.
Baser control (to be developed)¶
Used to connect to Baser.
Lobster control (to be developed)¶
Used to connect to Lobster.
Rings control (to be developed))¶
Used to access Rings.
Strain control (to be developed)¶
Used to connect to Strain.
PbeToGw control (to be developed)¶
The predicted GW band gap is generated based on the band gap obtained by the PBE.
Input |
Output |
---|---|
None |
None |
Parameter configuration:
VASP_CMD